Land Sourcing

Due to the typical nature of wind projects, wherein one WTG has to maintain optimal distance from the other, such projects are spread over a large tracts of land so as to harness the wind potential of that area efficiently.


Based on the results of wind resource assessment, typical areas of interest are analyzed including wind potential, availability of evacuation infrastructure, nature of land availability, accessibility, ease of movement of the WTG including accessories (logistics). With the help of various softwares available, micro siting (or placement of the WTG for optimal energy production) is conducted and lands are identified for sourcing.

This is jointly done by Land Resource Team, under continued advise from the Wind Resource Team, and land is acquired for the WTG, pathway, setting up Substations etc.